C6 Riverfront: Engineered Resilience

Converting a 7.1-hectare flood-prone asset into a premier modular community. Capitalizing on the SEMME Infrastructure Boom and the National Housing Crisis.

The "New EDSA" Advantage

The C-6 Expressway (SEMME) is the critical artery unlocking the East. Our property sits at the strategic choke point where the road meets the Pasig River. While the land requires civil engineering intervention, its location ensures massive value appreciation post-stabilization.

🛣️
Direct Frontage Immediate access to C-6 On/Off Ramps
🌊
River Logistics Potential for PAREX integration & transport

Connectivity Impact: Time Savings

Estimated travel time reduction via C-6 vs. Current Routes

The 6.5 Million Unit Crisis

The Philippines faces a staggering housing backlog. Government programs (4PH) and Pag-IBIG subsidies (3% interest) have created a guaranteed market for developers who can deliver inventory quickly.

6.5M
Total Housing Backlog

UN Estimate / PIDS Data

111K
2025 Pag-IBIG Target

Units funded via P156B Allocation

3%
Interest Rate Promo

Pag-IBIG special financing for socialized housing

Why Modular Construction?

Traditional construction on soft soil is slow and risky. Our modular approach decouples site preparation from vertical construction. While we stabilize the land, the factory builds the homes.

  • 30-50% Reduction in Build Time
  • Consistent Quality Control (Factory Setting)
  • Material Waste Reduced by ~40%

Efficiency Comparison

Modular vs. Traditional Hollow Blocks

Phase 1: Capital Deployment

We are raising PHP 150M to fund the Pilot Phase. The majority is allocated to "Civil Engineering" (Land Dev) to address the flood risk and creating the stable platform.

Strategic Roadmap

Phase I: The Platform (Year 1)

Earthworks focus. Importing 23k m³ of fill, constructing perimeter retention walls, and installing drainage. Goal: Stabilize 1.1 Hectares.

Phase II: The Pilot (Year 1.5)

Installation of first 50 Modular Units. Model unit opening and initial Pag-IBIG processing for buyers. Goal: Sales Validation.

Phase III: Scale & Exit (Year 3+)

Unlock remaining 6 hectares. Land value appreciation realization through bulk sale or continued development. Goal: 20%+ IRR Realization.

ESG & Climate Alignment

Investors are shifting to assets that can withstand climate realities. JLL reports that 72% of APAC firms now prioritize climate-resilient real estate.

🚧 +2 Meters
Elevation above Flood Line
🏗️ P15M
Invested in Flood Defenses